Romsey Signal Box Simulation
Up Line
Down Line
Down Line
Up Line
REDBRIDGE
EASTLEIGH
KIMBRIDGE
- 1
Down Main Outer Home & Distant
- 2
Down Main Inner Home - 7
- 3
Down Main Starting
- 4
Down Branch Distant - 3,5
- 5
Down Branch Home
- 6
Direction Lever From Eastleigh
- 7
Down Main Points
- 8
Up Branch Points
- 9
FPL on No. 8
- 10
Cross over Points East
- 11
Up Main Points
- 12
Up Siding No. 1 Points
- 13
Up Branch Starting
- 14
Up Siding No. 2 Points Release
- 15
Cross-over Points West Release
- 16
Up Branch Inner Home (Platform Starting) - 8,9
- 17
Up Main Advance Starting - 11
- 18
Up Main Inner Home (Platform Starting) - 9
- 19
Down Main Draw Ahead
- 20
Up Main Outer Home & Distant - 9
- 21
From Up Main Shunt - 10/12
- 22
From Down Main Shunt - 9,10
- 23
From Up Siding No. 1 Shunt - 9,12
Time | Box | Bell Code |
---|
This is a simulation of the levers and other controls inside the preserved Romsey signal box. Note that this is much easier to operate than the real thing since the map diagram is dynamic and shows current point and signal settings on the map. More details on the operation and implementation of the simulation are available. This is Romsey Signal Box Simulation Version 3.244.0
One or more javascript exceptions have occurred: